Morro Bay Power
HAI conducted a geotechnical investigation for design and construction of two 530-MW, natural gas-fired, combined cycle power plants within the existing MBPP site. HAI also performed a geotechnical investigation for evaluation and design of remediation alternatives for an existing 4,000-foot long levee around the proposed MBPP site.