1st Street Viaduct over LA River

HAI provided geotechnical design parameters and recommendations for seismic retrofit of the existing First Street Viaduct over Los Angeles River and for design and construction of an approximately new 24-foot wide bridge parallel and adjacent to the existing one. HAI also provided monitoring during static axial tensile load tests as well as Pile Dynamic Analysis (PDA) tests performed on the same pile.