• Skip to main content
  • Skip to footer
(949) 777-1266
  • Linkedin

Haieng

Geotechnical and Earthquake Engineers

  • Home
  • About
    • Our Company
    • Publications
  • Services
    • Geotechnical & Environmental Engineering
    • Construction Observation & Testing
    • Soil & Material Testing Lab
    • Noise & Vibration Monitoring
    • Advanced Testing
  • Projects
  • Careers
  • Contact
You are here: Home / Projects / Saugus Aquifer Treatment Plant

Saugus Aquifer Treatment Plant

AECOM Santa Clarita Groundwater Treatment System

The project consisted of geotechnical field investigation, laboratory testing, engineering analyses, observation and testing during construction of a proposed Groundwater Treatment System and an associated transfer tank located at the former Whittaker-Bermite facility. The largest component of the plant is a fluidized bed reactor that has a diameter of 14 feet and a height of 30 feet, and weighs approximately 350,000 lbs. All the tanks, vessels and equipment were supported on one large concrete slab with approximate dimensions of 60 x 91 feet. HAI performed field investigation, laboratory tests, geotechnical engineering analyses to provide recommendations regarding earthwork, shoring, backfill requirements, ground improvement and foundation design, geotechnical field observation and testing activities during construction.

Related Projects

Footer

HAI
Corporate Headquarters
250 Goddard
Irvine, CA 92618

Services

  • Geotechnical & Environmental Engineering
  • Construction Observation & Testing
  • Soil & Material Testing Lab
  • Noise & Vibration Monitoring
  • Advanced Testing

Useful Links

  • Home
  • Projects
  • Our Company
  • Publications
  • Careers
  • Contact

Contact

  • Phone

  • (949) 777-1266

  • Email

  • [email protected]

©2024 HAIENG.COM Hushmand Associates, Inc.-All Rights Reserved
  • Linkedin