• Skip to main content
  • Skip to footer
(949) 777-1266
  • Linkedin

Haieng

Geotechnical and Earthquake Engineers

  • Home
  • About
    • Our Company
    • Publications
  • Services
    • Geotechnical & Environmental Engineering
    • Construction Observation & Testing
    • Soil & Material Testing Lab
    • Noise & Vibration Monitoring
    • Advanced Testing
  • Projects
  • Careers
  • Contact
You are here: Home / Projects / Yorba Linda Water District Lakeview Reservoir Monitoring

Yorba Linda Water District Lakeview Reservoir Monitoring

Yorba Linda Water District Lakeview Reservoir Monitoring

The existing buried reservoir was commissioned in 2009 to replace two old steel tanks east of the site that was demolished during the reservoir’s construction. The buried reservoir is a reinforced concrete structure with a capacity of 8 million gallons and total footprint area of approximately 40,000 ft2. The site includes several ancillary structures such as inlet and outlet valve vaults, drainage valve vaults, underdrain observation vaults, reservoir access hatch and overflow, air gap discharge structures, and catch basin structures. HAI is tasked with ongoing monitoring on a semi-annual basis to observe and record trends of possible distress with geotechnical recommendations.

Related Projects

Footer

HAI
Corporate Headquarters
250 Goddard
Irvine, CA 92618

Services

  • Geotechnical & Environmental Engineering
  • Construction Observation & Testing
  • Soil & Material Testing Lab
  • Noise & Vibration Monitoring
  • Advanced Testing

Useful Links

  • Home
  • Projects
  • Our Company
  • Publications
  • Careers
  • Contact

Contact

  • Phone

  • (949) 777-1266

  • Email

  • [email protected]

©2024 HAIENG.COM Hushmand Associates, Inc.-All Rights Reserved
  • Linkedin